Beginning the process of bringing backfill onto the lot to level it up and then begin to extend it.
22 March 2025
06 March 2025
Leveling After the Demolition
After the house was demolished the rubble was leveled to provide a solid base to put backfill onto.
Demoltion Day
The house purchased in town was built on a rubble foundation and would not be suitable for building onto. The house was demolished and the lot is being extended to provide a large area for a new house / port which will allow for better access back and forth to False Bluff.
Subscribe to:
Posts (Atom)