05 April 2026

Majority of the Concrete Cap Poured for the Seawall

 


We were able to get the majority of the concrete cap poured for the seawall. The concrete mix started a bit rough but smoothed out by the end.

29 March 2026

Wasted a Day Waiting for Materials


Lots of delays and push backs on the delivery of the materials. It did give us all day to make sure the forms were ready enough to mix and pour concrete.

 

15 March 2026

Lost a Lot of Beach out at False Bluff

 


It had been many years since we had lost so much beach from False Bluff.  An early winter storm with a north / south current did some damage to our beach and coconut trees.

01 March 2026

15 February 2026

Done Hunting for Rocks and Concrete Cap Form

 


Getting materials brough in for the seawall took longer than expected.  We were finally able to get enough rock to move onto the next phase of constructing the seawall.

01 February 2026

Planning the Concrete Cap for the Earthbag Seawall


Now that the foundation of the seawall is almost complete I start working on the plan on how to cap it with concrete.

 

18 January 2026

Return Trip to Finish the Earthbag Seawall

 


After a few weeks away it was good to be back in Bluefields to finish up the earthbag portion of the seawall.

04 January 2026

Last Day to Work on the Earthbag Seawall

 


I was able to get a lot of material over to the lot on my final work day this trip, but I did not have enough time to get any of the earthbag seawall up.