Lots of delays and push backs on the delivery of the materials. It did give us all day to make sure the forms were ready enough to mix and pour concrete.
29 March 2026
15 March 2026
Lost a Lot of Beach out at False Bluff
It had been many years since we had lost so much beach from False Bluff. An early winter storm with a north / south current did some damage to our beach and coconut trees.
01 March 2026
How to Build a Concrete Cap for an Earthbag Seawall
Or maybe how not to do it. It turned out well in the end though.
15 February 2026
Done Hunting for Rocks and Concrete Cap Form
Getting materials brough in for the seawall took longer than expected. We were finally able to get enough rock to move onto the next phase of constructing the seawall.
01 February 2026
Planning the Concrete Cap for the Earthbag Seawall
Now that the foundation of the seawall is almost complete I start working on the plan on how to cap it with concrete.
18 January 2026
Return Trip to Finish the Earthbag Seawall
After a few weeks away it was good to be back in Bluefields to finish up the earthbag portion of the seawall.
04 January 2026
Last Day to Work on the Earthbag Seawall
I was able to get a lot of material over to the lot on my final work day this trip, but I did not have enough time to get any of the earthbag seawall up.
23 September 2025
Going to Build an Earthbag Seawall
We were able to gather rock and dirt from a construction site nearby. Instead of trying to shovel it into a truck I decided to fill bags and transport them to the lot. The bags could then be used as earthbags for the seawall.
02 September 2025
Starting the Seawall in Town
We started the seawall in town a few months ago. This will extend the lot and give us a place to build so everyone can get access False Bluff easier.
21 August 2025
North Farm at False Bluff
Nice walk around the north farm to pick some pineapples and see how the crops are growing.
29 May 2025
22 March 2025
Starting the Leveling and Backfill
Beginning the process of bringing backfill onto the lot to level it up and then begin to extend it.
06 March 2025
Leveling After the Demolition
After the house was demolished the rubble was leveled to provide a solid base to put backfill onto.
Demoltion Day
The house purchased in town was built on a rubble foundation and would not be suitable for building onto. The house was demolished and the lot is being extended to provide a large area for a new house / port which will allow for better access back and forth to False Bluff.
23 February 2025
16 February 2025
09 February 2025
02 February 2025
27 January 2025